Renovation ...
11/10/2009 17:00 Filed in:
Appenzeller
| Mumblings
| Musings
They actually finished renovating the north side of
the house a few weeks ago!
Watching them at work, it really is no wonder that
it took them so long ...
... they nailed up the shingles one at a time!
Really, the guy doing the work nailed a piece of
metal to the wall, aligned a shingle to the metal
and shot two staples into it. Took the next
shingle, aligned it to the metal and shot two
staples into it. Took the next shingle ...
Amazing!
After doing this sort of work for over two hundred
years, now, you'd think they'd have discovered a
swifter way to work. Well, not here.
They say that the Swiss are slow (the Swiss say
it's only the people from Basel that are slow, but
I beg to differ!). Watching them work makes me fall
asleep!
If anybody from the Swiss-Wall-Cladding-Industry
wants a tip on how to speed things up - just give
me a call ...
At least the shingles are wood, though, before work
was started, I was afraid they were going to use
the cheaper, asbestos version that some newer
houses are clad in.